60 WEST EASY ST #5, SIMI VALLEY, CALIFORNIA 93065, USA  |  805.522.2232
RustOleum Project
  • Pure Vision Design
    • About Us
    • The Shop
    • Steve Strope
    • The Crew
    • Contact
  • Rides
    • Projects
    • BMX Bikes
    • Videos
  • HALO
  • Vendors
  • PV Racing
    • Drag Racing
    • Dirt Track
  • Media
    • Printed Media
    • Social Media
  • News
  • PV SWAG
  • Pure Vision Design - Home
  • Rides
  • Projects
  • RustOleum Project

RustOleum Project

  • Previous Project Previous Project
  •    
  • Next Project Next Project

Project

1969 Plymouth RoadRunner



Hot Rod Magazine calls… 

They need a car built for the good people over at RustOleum…

They need it road ready for the Power Tour…

The Power Tour is in 3 ½ weeks…

No problem!

In 3 ½ weeks this Plymouth went from stray dog to late sixties Saturday Night Special!  For the cool factor, it’s pretty hard to beat a 1969 Road Runner with a 440, a 4-speed and a Dana 60!  But add a wicked drag race stance along with the “bigs and littles” and DANG! -that looks sweet!

 

 We couldn’t do it without some very special friends:

 

 

HIGHLIGHTS


Mick’s Paint   -paint and body. IN ONE WEEK!

Year One     -all those absolutely necessary restoration parts!

ARP     -the worlds best fasteners and hardware

Budnik Wheels     -the bitchin rear wheels (Formosa dished 15 X 10)

Rocket Racing Wheels     -the killer front 5 spokes (Fuel 15X 6)

Andrews Powder Coating     - the way-bad Dow 7 looking finish on the rims

Tube Technologies Inc.     -the best fitting Mopar headers and exhaust system on the planet

Eric Thorsen Custom Upholstery     - transforming the funky ‘ol seats

Flaming River     - the new fast ratio steering box

Hoosier Tire     - those big doughnuts and little skinnys

Xtreme Powder Coating     - powder coating all the suspension parts overnight

Above All Glass     - swapping in fresh glass at a moments notice

 

RustOleum RoadRunner Video 5

November 01, 2011

After three weeks, its time to finish assembly and get this project off to Power Tour.

Read More

RustOleum RoadRunner Video 4

October 01, 2011

With three weeks to get this car ready for Power Tour, here's some quick clean up on the body.

Read More

RustOleum RoadRunner Video 3

September 01, 2011

With three weeks to get this car ready for Power Tour, it time for a quick respray.

Read More

RustOleum RoadRunner Video 2

August 01, 2011

With three weeks to get this car ready for Power Tour, its time for some engine detailing.

Read More

RustOleum RoadRunner Video 1

July 01, 2011

With three weeks to prepair this car for Power Tour, here's what we started with.

Read More

1

© 2018 Pure Vision Design. All Rights Reserved.